Unitech Group
Burntwood, Staffordshire
Asbestos cement roof replacement, gutter refurbishment and solar PV installation
8 months
Roofclad Systems refurbished the roof of Unitech Group’s 90,000 sq ft live production facility in Burntwood, Staffordshire.
The works included replacing 5,555m² of asbestos cement roofing, refurbishing the gutters, and installing an insulated roof with integrated solar PV to improve energy efficiency and weather protection.
Careful planning kept production running safely throughout the project.
Key Results
The project presented several technical and operational challenges:
Asbestos cement sheets were removed intact into specialist skips. Progressive Monarflex sheeting, safety netting, scaffold edge protection, PPE and regular toolbox talks protected the live facility throughout.
Roofclad Systems developed a comprehensive refurbishment solution combining asbestos cement roof replacement, gutter relining and solar PV installation.
The existing roof sheets were carefully removed under controlled conditions and replaced with a modern insulated composite roofing system. Before the new roof panels were installed, the existing gutters were relined using the Weatherfast Guttering system to restore effective rainwater management.
New internal and external ridge flashings, together with bespoke details around the flues and vents, provided a secure and weather-resistant finish. Triple-skin GRP rooflights were also incorporated to introduce natural light into the facility.
By integrating the solar PV installation into the roof refurbishment, Roofclad Systems helped the client avoid the future cost and disruption of removing and reinstalling solar panels when the ageing roof eventually needed replacing.
The completed refurbishment provided Unitech Group with a modern, insulated and weatherproof roofing system, significantly improving the condition and long-term performance of the building envelope.
The new Tata Steel Trisomet roofing system achieved a U-value of 0.16 W/m²K, while upgraded gutters, rooflights and bespoke flashings improved weather protection and natural daylight.
The integrated 592-panel solar PV installation is estimated to generate 240,967 kWh of renewable electricity annually, supporting the client’s long-term energy strategy.
Through careful planning, phased working and close coordination with the client’s operational team, the eight-month programme was delivered with minimal disruption to ongoing manufacturing activities.
By combining roof replacement and solar PV installation within a single coordinated project, Roofclad Systems also helped avoid the additional costs and disruption associated with installing solar panels onto an ageing roof that would subsequently require replacement.
“Roofclad Systems worked safely and coordinated effectively with our on-site operations. The team responded well to challenges, maintained good Health & Safety standards and delivered quality workmanship. The installation team were helpful and easy to work with, making it a positive experience overall.”
– Stuart Harrison, General Manager – Unitech Group